Latest information Tenders
nagaland
- slope stabilisation and soil protection works at km 34.05 (teitrung bridge), km 27.900 (shonsho bridge), km 33.250 (mayung bridge) and km 84.575 (mokaha bridge) on road tuensang-mon under 100 rcc/ 15 brtf (p) sewak in nagaland state under epc mode
- Authority : Border Roads Organisation
- Deadline : 28 Nov 2026
- Value : 55.11 Crores
- Download
neemuch, madhya pradesh
- construction of khatunga to dhardi makhanganj road length 21.50 km. din neemuch
- Authority : Public Works Department
- Deadline : 27 Oct 2026
- Value : 74.49 Crores
- Download
mandsaur, madhya pradesh
- construction of poladungar to chikniya kurlasi chukni dudhakhedi tungni bhanpura road length 44.90 km including electric work dn. mandsaur
- Authority : Public Works Department
- Deadline : 27 Oct 2026
- Value : 87.71 Crores
- Download
vijayawada, andhra pradesh
- hnss project phase i -package no kottalapalli lift scheme design supply errection and commissioning of kottalapalli lift scheme in the vajrakarur mandal to lift the 100 cusecs of water to irrigate the 10 500 acres in the uravakonda vidapanakal and vajraka
- Authority : Irrigation And Cad Department
- Deadline : 21 Oct 2026
- Value : 42.76 Crores
- Download
jammu, jammu & kashmir
- execution of surfacing works on service track in 26 inf div aor under 57 rcc in 35 brtf project sampark in jk (ut)
- Authority : Border Roads Organisation
- Deadline : 02 Nov 2026
- Value : 37.50 Crores
- Download
shajapur, madhya pradesh
- construction of upgradation and widening of kalapipal khamlay amlay road total length 29.00 km in including electric pole shifting work under pwd din s shajapur
- Authority : Public Works Department
- Deadline : 27 Oct 2026
- Value : 61.35 Crores
- Download
bhubaneswar, orissa
- construction of pediatric cancer facility unit at hbch rc at jatni, khurdha, odisha. (phase-a).
- Authority : Central Public Works Department
- Deadline : 27 Oct 2026
- Value : 39.98 Crores
- Download
bengaluru, karnataka
- upgradation of 2x5mva, 33/11kv sub-station to 2x20mva, 110/11kv &1x20mva, 110/33kv sub-station at sarasamba village in aland taluk, kalaburagi district along with construction of 110kv dc line on dc towers using panther conductor from existing 110kv rudrawadi sub-station for a distance of about 18.652km and construction of two numbers of 110kv terminal bays at 110kv rudrawadi sub-station for termination of proposed 110kv dc line on dc towers using panther conductor from proposed 110/33/11kv sara
- Authority : Karnataka Power Transmission Corporation Limited
- Deadline : 02 Nov 2026
- Value : 37.89 Crores
- Download
kathua, jammu & kashmir
- d a c of 30 m br changad nallah at km 3.180, 80 m kyal khad br at km 5.140, 70 m over barna nallah at km 5.860 a 180 m theyn br at km 8.600 on rd lakhanpur theyn along with its appr, hydr data, ssi, p check, br sch, 35 brtf project spk in jk ut t epc
- Authority : Border Roads Organisation
- Deadline : 03 Nov 2026
- Value : 37.10 Crores
- Download
ballabgarh, haryana
- master sew scheme faridabad- tertiary treatment with disc filters on existing stps of 45, 80 and 100 mld along with additional provisions of blowers, claridigester, neutralisation tank, flash mixer, clariflocculator, etc. and oandm/dlp of 11 years
- Authority : Government Of Haryana
- Deadline : 11 Nov 2026
- Value : 70.45 Crores
- Download
tenders information from :
