replacement of utube bundle assembly in, parbatpur (assam) , deadline is 05 aug 2026
| replacement of u-tube bundle assembly in mp column steam reboiler and regtification of bfw pre-heater leakage by plugging leaky tubes after hydrotesting in 500 tpd methanol plant of apl during the forthcoming shutdown | |
| Deadline | 05 aug 2026 |
| Tenders Location | parbatpur - assam |
| Tenders Value | Refer Document |
| Document Cost | Refer Document |
| Tender categeory | engineering, plants and machinery |
| Our Ref. ID | 2607234135570 |
| Download Tender Document | |
