tender value above hundred crore
sivasagar, assam
- construction of 4 lane twin tube road cum rail underwater tunnel under river brahmaputra, including 4 lane approaches along with provision of railway infrastructure in one of the tubes, in the state of assam on epc mode
- Authority : National Highways Infrastructure And Development Corporation Limited
- Deadline : 30 Sep 2026
- Value : 11982.36 Crores
- Download
shimla, himachal pradesh
- epc package with land for development of grid connected solar pv projects of aggregate capacity up to 1000 mw in the states of punjab and rajasthan including comprehensive operation and maintenance for five years
- Authority : Sjvn Limited
- Deadline : 16 Sep 2026
- Value : 9999.99 Crores
- Download
guwahati, assam
- construction of 4 lane highway from baihata chariali (ch. 0.000), near guwahati to tezpur (ch. 150.971) excluding mangaldoi bypass (from ch. 28.500 to ch.42.590) along nh-15 in the state of assam on bot toll mode.
- Authority : National Highways Infrastructure And Development Corporation Limited
- Deadline : 05 Oct 2026
- Value : 7642.20 Crores
- Download
ambattur, tamil nadu
- request for qualification cum request for proposal for development of the second container terminal at kamarajar port limited under ppp mode on design, build, finance, operate and transfer (dbfot) basis 20 th august
- Authority : Ministry Of Shipping
- Deadline : 30 Oct 2026
- Value : 4288.26 Crores
- Download
kishtwar, jammu & kashmir
- construction of uni-directional singhpora - vailoo twin tube tunnel (under sinthan pass) and its approach roads on kishtwar - vailoo - khanabal section of nh-244 in the union territory of jammu and kashmir on epc mode
- Authority : National Highways Infrastructure And Development Corporation Limited
- Deadline : 26 Oct 2026
- Value : 3567.51 Crores
- Download
delhi
- development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 274.000 to ch. 348.039 in the state of uttar pradesh on ham mode
- Authority : National Highways Authority Of India
- Deadline : 02 Nov 2026
- Value : 3432.76 Crores
- Download
delhi
- development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 212.600 to ch. 274.000 in the state of uttar pradesh on ham mode
- Authority : National Highways Authority Of India
- Deadline : 02 Nov 2026
- Value : 3144.34 Crores
- Download
delhi
- development of greenfield high-speed access controlled corridor from shamli gorakhpur from ch. 348.453 to ch. 422.500 in the state of uttar pradesh on ham mode
- Authority : National Highways Authority Of India
- Deadline : 02 Nov 2026
- Value : 3091.06 Crores
- Download
chenani, jammu & kashmir
- construction of uni-directional sudhmahadev -dranga twin tube tunnels and its approach roads on chenani - sudhmahadev - goha section of nh-244 in the union territory of jammu and kashmir on epc mode
- Authority : National Highways Infrastructure And Development Corporation Limited
- Deadline : 15 Oct 2026
- Value : 2765.71 Crores
- Download
delhi
- rehabilitation and upgradation of existing 4 l highway to a 6 l divided carriageway of orai barah section of nh 27 from ex. km 1515.713 to km 1578.383 in the state of uttar pradesh on ham (total length 62.670 km).
- Authority : National Highways Authority Of India
- Deadline : 03 Nov 2026
- Value : 2440.55 Crores
- Download
mumbai, maharashtra
- request for selection (rfs) document for selection of vendors for design, manufacture, supply, transport, installation, testing and commissioning of off-grid dc solar photovoltaic water pumping systems of 3 hp, 5 hp & 7.5 hp capacity at identified farmers site in district of maharashtra, including complete system warranty and its repair and maintenance for 5 years under magel tyala saur krushi pump / pm kusum b scheme
- Authority : Maharashtra State Electricity Board
- Deadline : 06 Oct 2026
- Value : 2421.44 Crores
- Download
delhi
- development of high-speed access controlled greenfield corridor from shamli gorakhpur from ch. 422.500 to ch.466.000 in the state of uttar pradesh on ham mode (package 8) (design length 43.500 km.).
- Authority : National Highways Authority Of India
- Deadline : 03 Nov 2026
- Value : 1942.57 Crores
- Download
delhi
- rehabilitation and upgradation of existing 4 l highway to a 6 l divided carriageway of jhansi orai section (pkg-2) from design km 1423.000 sultanpura village to design km 1469.000 near ingui khurd village nh-27 in up on ham mode. (tl 46.000 kms).
- Authority : National Highways Authority Of India
- Deadline : 21 Oct 2026
- Value : 1711.70 Crores
- Download
delhi
- balance work for construction of 8-lane access-controlled expressway from km 154.6 to km 190.0 of vadodara mumbai expressway (jujuwa to gandeva section) in gujarat on epc mode (pkg-viii)-02nd call
- Authority : National Highways Authority Of India
- Deadline : 13 Oct 2026
- Value : 1475.68 Crores
- Download
delhi
- rehabilitation and upgradation of existing 4 l highway to a 6 l divided carriageway of jhansi-orai sec. (pkg-1) from design km 1378.915 near jhansi (sijwaha tiraha nh 27) to design 1423.000 near sultanpura village nh-27 in up on ham mode. (tl 44.085 kms)
- Authority : National Highways Authority Of India
- Deadline : 21 Oct 2026
- Value : 1453.66 Crores
- Download
delhi
- rehabilitation and upgradation of existing 4 l highway to a 6 l divided carriageway of jhansi orai section (pkg-3) from design km 1469.000 near ingui khurd village to design km 1515.710 near orai (bandha village) nh-27 in uttar pradesh on ham mode.
- Authority : National Highways Authority Of India
- Deadline : 21 Oct 2026
- Value : 1230.35 Crores
- Download
delhi
- development/upgradation of existing 4 lane to 6 lane of lucknow sitapur section km 412.745 to km 479.327 (length 66.582 km) of new nh 30 in the state of uttar pradesh on bot (toll) mode
- Authority : National Highways Authority Of India
- Deadline : 18 Sep 2026
- Value : 1123.24 Crores
- Download
delhi
- upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
- Authority : Ministry Of Road Transport And Highways
- Deadline : 24 Sep 2026
- Value : 1100.69 Crores
- Download
hyderabad, telangana
- construction of gpra at amaravati, the new capital city of andhra pradesh. sh: planning, designing and construction of 1504 residential quarters comprising 600 type-ii quarters in 3 towers ( g plus 24 each), 600 type-iii quarters in 3 towers ( g plus 24 each), 228 type-iv quarters in 3 tower ( g plus 18 each), 56 type-v quarters in 1 tower ( g plus 13) and 20 type-vi quarters in 1 tower ( g plus 9), with a common double basement, ancillary building ( g plus 4), boundary wall, entrance gate compl
- Authority : Central Public Works Department
- Deadline : 07 Oct 2026
- Value : 1083.41 Crores
- Download
delhi
- balance work of six laning of kagal satara section of nh 48 (old nh 4) package i from km 592.500 to km 658.000 in the state of maharashtra to be executed on epc mode under bharatmala pariyojana
- Authority : National Highways Authority Of India
- Deadline : 28 Oct 2026
- Value : 994.97 Crores
- Download
tenders information from :
