hardwar tenders information
hardwar, uttaranchal
- strengthening of embankment bishanpur-kundi-bhogpur balawali-balawali khanpur under cm announcement no. 739/2025 (part-2)
- Authority : Irrigation And Flood Control Department
- Deadline : 05 Dec 2026
- Value : 130.17 Crores
- Download
hardwar, uttaranchal
- gis based storm water master drainage plan of haridwar city district haridwar (phase-i) zone-i the area between railway line and laltara bridge to right bank of upper ganga canal
- Authority : Irrigation And Flood Control Department
- Deadline : 11 Dec 2026
- Value : 112.86 Crores
- Download
hardwar, uttaranchal
- re-construction and strengthening of balawali to khanpur bund on right bank of river ganga in district haridwar
- Authority : Irrigation And Flood Control Department
- Deadline : 05 Dec 2026
- Value : 103.58 Crores
- Download
hardwar, uttaranchal
- redevelopment and beautification of road median from shivmurti chowk to arya nagar chowk (old niti pass) in haridwar city
- Authority : Development Authority
- Deadline : 09 Dec 2026
- Value : 6.04 Crore
- Download
hardwar, uttaranchal
- construction work of 05 km cc road in jwalapur area of haridwar assembly constituency in haridwar district under state sector (cm ghoshna-317 / 2026)
- Authority : Public Works Department
- Deadline : 09 Dec 2026
- Value : 3.95 Crore
- Download
hardwar, uttaranchal
- construction work of 05 km cc road in central haridwar area of haridwar assembly constituency in haridwar district under state sector (cm ghoshna-338 / 2026)
- Authority : Public Works Department
- Deadline : 09 Dec 2026
- Value : 3.45 Crore
- Download
hardwar, uttaranchal
- beautification and upgradation work at bhimgoda kund haridwar
- Authority : Development Authority
- Deadline : 28 Nov 2026
- Value : 2.84 Crore
- Download
hardwar, uttaranchal
- temporary work in kumbh mela-2027
- Authority : Uttarakhand Power Corporation Limited
- Deadline : 03 Dec 2026
- Value : 2.05 Crore
- Download
hardwar, uttaranchal
- construction of parking from maa chandi devi ropeway to bus stop using interlocking paver block
- Authority : Development Authority
- Deadline : 28 Nov 2026
- Value : 1.74 Crore
- Download
hardwar, uttaranchal
- construction of ghat between thokar no. 15 and 16 in dudhiyabandh area along right bank of ganga river in district haridwar
- Authority : Irrigation And Flood Control Department
- Deadline : 04 Dec 2026
- Value : 1.22 Crore
- Download
hardwar, uttaranchal
- proposed parking and drain near tulsi chowk
- Authority : Development Authority
- Deadline : 02 Dec 2026
- Value : 1.19 Crore
- Download
hardwar, uttaranchal
- for engagement of vehicle
- Authority : Uttarakhand Power Corporation Limited
- Deadline : 07 Dec 2026
- Value : 7.92 Lac
- Download
hardwar, uttaranchal
- providing and fixing of curtain and repairing of wooden furniture of cushion chairs and sofa sets in various offices of heep
- Authority : Bharat Heavy Electricals Limited
- Deadline : 30 Nov 2026
- Value : 4.17 Lac
- Download
hardwar, uttaranchal
- reconstruction of internal roads by tarring (bituminous surfacing) in g-cluster and t-cluster of shivalik nagar in constituency bhel ranipur distt. haridwar under state sector
- Authority : Public Works Department
- Deadline : 08 Dec 2026
- Value : Refer Document
- Download
hardwar, uttaranchal
- reconstruction of the road by tarring (bituminous surfacing) from in front of gas plant petrol pump to ambedkar chowk in constituency bhel ranipur distt. haridwar under state sector
- Authority : Public Works Department
- Deadline : 08 Dec 2026
- Value : Refer Document
- Download
hardwar, uttaranchal
- supply of machining of item with bhel material
- Authority : Bharat Heavy Electricals Limited
- Deadline : 07 Dec 2026
- Value : Refer Document
- Download
hardwar, uttaranchal
- renovation of buildings rb and nrb in cisf complex in bhel township haridwar
- Authority : Bharat Heavy Electricals Limited
- Deadline : 07 Dec 2026
- Value : Refer Document
- Download
hardwar, uttaranchal
- repair of road between light foundry shop and ffd civil maintenance office
- Authority : Bharat Heavy Electricals Limited
- Deadline : 05 Dec 2026
- Value : Refer Document
- Download
hardwar, uttaranchal
- supply of solenoid valve
- Authority : Bharat Heavy Electricals Limited
- Deadline : 05 Dec 2026
- Value : Refer Document
- Download
hardwar, uttaranchal
- re-construction of internal roads by tarring (bituminous surfacing) in sector-3 bhel in constituency bhel ranipur distt. haridwar under state sector
- Authority : Public Works Department
- Deadline : 08 Dec 2026
- Value : Refer Document
- Download
